Mcleod Cranes Ltd - Crane Hire

Friday, June 06, 2008

Chapel Street Off Ramp




Fletcher Construction placing the first beams for Transits Harbour Link project. Our 130 Tonne crane with Brian and Roy was used at one end to place the 70 Tonne beam.
Posted by Picasa
©Copyright 2005 McLeod Cranes | Terms and Conditions of Trade

Valid XHTML 1.0 Transitional

Hold Fast