Pictured the team at Jensen Steel Fabricators place one of the heavy support columns at about forty four metres from the crane. With sixty four metres of boom on the GMK5170 the deflection is visible in these pictures.
Great smooth lift by our operator John Wrafter. The weather for this lift was excellent. But yesterday I snapped a photo in the run with low cloud cover. A different story where the boom is almost covered by the clouds.



0 comments:
Post a Comment